EducationalCompleted

Soilless Farm Lab Hostel

12 Blocks of Hostel accommodation for agricultural research facility

₦850 Million
2022
Awowo Village, Abeokuta
24 months
Soilless Farm Lab Hostel
Project Overview

The Soilless Farm Lab Hostel project involved the construction of 12 modern hostel blocks designed to accommodate researchers and students at the agricultural research facility. This project emphasized sustainable construction practices and modern amenities suitable for academic accommodation.

Project Gallery
Soilless Farm Lab Hostel - Image 1Soilless Farm Lab Hostel - Image 2Soilless Farm Lab Hostel - Image 3Soilless Farm Lab Hostel - Image 4
Challenges
  • Remote location with limited infrastructure
  • Sustainable construction requirements
  • Coordination with ongoing research activities
  • Specialized utility requirements for research facility
Solutions
  • Established temporary construction infrastructure
  • Implemented eco-friendly construction materials and methods
  • Phased construction to minimize disruption to research
  • Custom utility design for research facility needs
Key Features
12 blocks of modern hostel accommodation
400+ bed capacity with modern amenities
Central dining and recreation facilities
Research-friendly study spaces
Sustainable water and waste management systems
Solar power integration
Landscaped common areas
24/7 security systems
Project Information
Client:

Soilless Farm Laboratory

Project Manager:

Engr. M.A. Adigun

Duration:

24 months

Status:Completed
Technical Specifications
Total Blocks:12
Bed Capacity:400+
Total Floor Area:15,000 sqm
Building Height:3 storeys
Foundation Type:Strip Foundation
Structural System:Load Bearing Masonry
Project Timeline

Site Preparation

3 months

Completed

Foundation & Structure

12 months

Completed

MEP Installation

6 months

Completed

Finishing Works

3 months

Completed

Interested in a Similar Project?

Let's discuss how we can bring your vision to life with our expertise